How Long Does a Kitchen Remodel Take? A Glendale, CA Guide

If you’re considering a kitchen remodel in Glendale, CA, you’re likely wondering how long the entire process will take. Kitchen remodeling is a significant investment, both financially and in terms of time. The duration of a kitchen remodel varies depending on the project’s scope, complexity, and whether unforeseen issues arise. However, with proper planning and the right contractor, the process can be streamlined.

As a licensed general contractor based in Glendale, CA, we at Major Construction specialize in kitchen and bathroom remodeling services for both residential and commercial properties. Whether you're looking for a full kitchen overhaul or a simple refresh, we offer our services in Glendale, Los Angeles, and nearby areas. To learn more about our offerings, visit our services page.

Factors Affecting the Duration of a Kitchen Remodel

Planning & Design Phase (1 to 4 weeks):
The first step involves choosing the layout, materials, and design of your kitchen. This phase includes consultations with your contractor, selecting cabinets, countertops, and fixtures. The design phase can be completed in as little as one week but may take up to four weeks depending on the complexity of your vision.

Permits & Approvals (1 to 3 weeks):
If your project involves structural changes, electrical work, or plumbing modifications, you'll likely need permits from the local Glendale city authorities or Los Angeles County. Acquiring these permits typically takes one to three weeks. Our team at Major Construction is experienced in handling permits, ensuring your project complies with all regulations.

Demolition (2 to 4 days):
Once permits are secured, the demolition of your old kitchen can begin. This process usually takes two to four days, depending on the size and complexity of the kitchen.

Plumbing, Electrical & Structural Work (1 to 3 weeks):
If you’re relocating appliances, installing new lighting, or adding plumbing, this phase can take between one and three weeks. Hiring a licensed contractor, like Major Construction, ensures that all work is done efficiently and according to code.

Installation of Cabinets & Countertops (1 to 3 weeks):
Cabinets are often custom-built, so their installation may take anywhere from one to three weeks. Countertops are typically installed after the cabinets, which can add another week to the timeline.

Flooring, Painting & Finishing Touches (1 to 2 weeks):
Once the major installations are complete, the final steps include laying flooring, painting, and adding finishing touches such as backsplash, light fixtures, and hardware. This phase usually takes between one and two weeks.

Final Inspections & Walkthrough (1 to 2 days):
The final stage involves ensuring everything is up to standard and passing any required inspections. We always conduct a final walkthrough with our clients to confirm satisfaction.

Total Time:

In general, a kitchen remodel can take anywhere from 4 to 8 weeks, depending on the factors listed above. Larger, more complex projects can take up to 3 months, but with the right contractor, delays can be minimized.
At Major Construction, we pride ourselves on delivering high-quality remodeling services on time and within budget. Our team works closely with clients to ensure that the remodeling process is as smooth and efficient as possible. If you're considering a kitchen remodel in Glendale, CA, or the surrounding Los Angeles areas, contact us today for a free consultation or visit our company page for more details.